by
Published on 12th November 2013 01:44 PM
Number of Views: 780
Events took a dramatic turn this morning and the media arrive, at Bastion Point, Mallacoota. The GPM staff started work this morning, and the development site was not checked before proceeding with equipment. A vehicle operator was stopped, with only a 5 metres buffer, alerting them to
...